Skip to content

🌲Origins & milestones

Wood · Anisotropic cellulose composite grown as trees — carpentry, mass timber and a combustible story that codes still manage.

Wood did not arrive as a finished commodity. Palaeolithic tools; CLT 1990s Austria around Global forests / Graz still explains who makes it and which tests it sits in.

Ten dated points, five eras and three milestones below are the spine — not a complete industrial history.

Where it began

Palaeolithic tools; CLT 1990s AustriaGlobal forests / Graz

Timeline

prehistoryHafted tools

Wood as the first structural composite.

medievalTimber frames

Oak frames and Japanese joinery traditions.

1830sBalloon frame

Cheap nails + pine remade North American housing.

1906Glulam patents

Weimar halls — laminated timber.

1930sPlywood aircraft

Mosquito and Hughes — wood as aero.

1990sCLT Austria

Cross-laminated timber for walls and floors.

2010sTall wood codes

18-storey pilots (Vancouver, Norway, etc.).

2010sAcetylated / thermally modified

Dimensional stability without CCA-era toxics.

2020sEmbodied-carbon argument

Wood vs concrete as climate politics.

2020sMass-timber fire tests

Char rates entered mainstream engineering.

The eras

Wood
Anonimski · CC0 · Wikimedia Commons
prehistory

Hafted tools

Wood as the first structural composite.

1830s

Balloon frame

Cheap nails + pine remade North American housing.

1930s

Plywood aircraft

Mosquito and Hughes — wood as aero.

2010s

Tall wood codes

18-storey pilots (Vancouver, Norway, etc.).

2020s

Embodied-carbon argument

Wood vs concrete as climate politics.

Milestones

Glulam patents

1906

Weimar halls — laminated timber.

Tall wood codes

2010s

18-storey pilots (Vancouver, Norway, etc.).

Mass-timber fire tests

2020s

Char rates entered mainstream engineering.

Knowing this timeline is how to read a mill certificate without treating Wood as timeless.

Keep exploring

More in Ceramics & wood