Skip to content Skip to a section
Waterfall

Studio

How a total was built — start, pluses, minuses, end. The finance slide that still earns its keep. Work. P&L bridges, budget vs actual, headcount walks.

At a glance
Score intensity

Darker cells mean a higher score for this topic on that metric.

Last reviewed Sources & creditsMedia creditsMethodology

Quick answers

When should I pick Waterfall?

When the story is: P&L bridges, budget vs actual, headcount walks.

When should I avoid Waterfall?

Skip it in cases like: the story is a trend over many periods, not a bridge.

Who invented or popularised it?

Popularised in 1980s–90s consulting decks (McKinsey waterfall)

What does it encode?

signed bar height from a running total

Is it OK in ads?

Yes if one claim is visible at a glance in Meta, Google and retail print; otherwise link to a full figure.

Will a teacher accept it?

Yes for lab reports and poster boards if axes, units and a source line are present.

Start with this section - Studio

Waterfall encodes values as signed bar height from a running total. Popularised in 1980s–90s consulting decks (McKinsey waterfall).

In reports, ads and assignments it fits P&L bridges, budget vs actual, headcount walks. Skip it when the story is a trend over many periods, not a bridge.

Studio

Make shapes, diagrams and charts in the browser. Download SVG or PNG — nothing is uploaded.

Open studio → From a file Icons library

Work

Ads

School

Steps

  1. Steps 1 — Write the claim in one sentence.
  2. Steps 2 — Check that Waterfall fits the claim. If not, switch.the story is a trend over many periods, not a bridge
  3. Steps 3 — Draw it flat in Excel or Google Sheets or PowerPoint.
  4. Steps 4 — Direct labels, faint grid, claim-title.
  5. Steps 5 — Check greyscale and a color-blind simulator.
  6. Steps 6 — Add source, period, units; export SVG/PDF.

Waterfall: honour signed bar height from a running total, and switch when the story is a trend over many periods, not a bridge.

← Mistakes Waterfall Tools →