Skip to content
Waterfall

Anatomy

How a total was built — start, pluses, minuses, end. The finance slide that still earns its keep. Mark. P&L bridges, budget vs actual, headcount walks.

Waterfall encodes values as signed bar height from a running total. Popularised in 1980s–90s consulting decks (McKinsey waterfall).

In reports, ads and assignments it fits P&L bridges, budget vs actual, headcount walks. Skip it when the story is a trend over many periods, not a bridge.

+40 +18 -12 +22 -8 60
Waterfall

Parts

Variants

Labels

Waterfall: honour signed bar height from a running total, and switch when the story is a trend over many periods, not a bridge.

← The idea Waterfall When to use →