Skip to content Skip to a section
The axis

Pitch decks in 2000: Shared baseline

Craft: honour one idea per slide; a chart only if it is the sentence and decoration falls away. Keep Pitch decks with “Shared baseline” and 2000 from 2000. The scale must show zero (or a declared break) and units.

In reports, ads and assignments it fits fundraising, sales kickoffs, grant talks, competition finals. Skip it when dumping the whole dashboard — a deck is a speech, not a warehouse. This page gathers anatomy, fit, craft, failure modes and work / ads / school recipes for Pitch decks.

When the story is: fundraising, sales kickoffs, grant talks, competition finals. Skip it in cases like: dumping the whole dashboard — a deck is a speech, not a warehouse. Sequoia/a16z memo culture plus Keynote-era startup theatre one idea per slide; a chart only if it is the sentence

Yes if one claim is visible at a glance in Meta, Google and retail print; otherwise link to a full figure. Yes for lab reports and poster boards if axes, units and a source line are present. Excel or Google Sheets or PowerPoint; export SVG/PDF. Do not rely on hue alone. Label directly and check greyscale.

Keep axis, unit, and year. If “Shared baseline” is the axis, the figure is 2000 and the year is 2000. Keep Pitch decks with “Shared baseline” and 2000 from 2000. 20002000

Figures to keep

Year of the chart
2000
Axis figure
2000
Chart
Pitch decks
How to read it
Shared baseline

Quarterly report visuals in 1980: Shared baselineNext essayAll 1100 essays1100